
We have completed works on a shared foul drainage system that serves two large properties in Ivinghoe, Bedfordshire. The new Sewage Treatment Plant has been installed to replace a failed historic Septic Tank and Soakaway. The new replacement unit installed is a Marsh Industries 16population Sewage Treatment Plant, accurately sized to serve the two properties and their residents. The unit has been installed in a discreet location along the front boundary hedge, for ideal access for future tankering and servicing visits. Once this unit was installed we excavated a trial hole and carried out a porosity test and from the data collected we were able to design and install a suitable soakaway adjacent to the new Sewage Treatment Plant.
Please see our photos below to see this project in action.