We have installed a borehole soakaway at a property in Frieth which was suffering from a failing system. This property has a modern Sewage Treatment Plant installed which discharges treated effluent to a soakaway. The soakaway was backing up into the unit and initial works to revive the old soakaway made only a slight improvement. As a result we proposed the following action:
We retrofitted the existing soakaway chamber to become a pump station. We laid a new pumping main sub surface across the garden to a newly installed headworks chamber. At this agreed location our Drilling Team drilled and constructed a new borehole soakaway.
We are pleased to say that our client was thrilled and impressed by our neat and tidy installation.