Marsh Industries Sewage Treatment Plant Installation in Stokenchurch – August 2016

Sewage Treatment Plant installation completed successfully despite challenging extreme high groundwater conditions. The Installation replaced an out of date Klargester at a riverside location in Windsor, Berkshire. This site had extreme issues with a high water table, the River Thames flowing only six metres away from the unit. To combat the high groundwater and the prospect of unstable ground our Installation Team carried out extensive de-watering of the excavation in conjunction with our bespoke shuttering system throughout the works. Please see our photos and video footage below to see this in action.