
We have very recently installed a large Klargester HEQ80 Sewage Treatment Plant at a popular tourist attraction outside London. This Plant at over 15.8m in length and weighing a whopping 5400kg, was craned in and installed and commissioned by our Drainage Team. Due to access constraints we were unable to bring this 15.8m long sewage plant onto the site in its entirety piece so it was brought in in two halves and rebuilt on site. Now that this large plant is up and running, our engineers continue to attend the site to maintain, empty and service the plant on a routine basis, working alongside staff at the site, to ensure that this Sewage Treatment Plant continues to provide a reliable, efficient and environmentally safe solution for the sewage disposal of the popular attraction and its 50 residential dwellings, for years to come.